佛山镀锌球接栏杆 锌钢栏杆 电厂平台66球形立柱
Foshan galvanized steel balustrade 66 spherical column of power plant platform
①为了安全请由第一阶段安装。
① For safety, please install by phase one.
②第一阶段安装定位后,安装第二个立柱,但不要紧固。
② After the first stage of installation and positioning, install the second column, but do not tighten it.
③穿入栏杆管件至第一根立柱半个球位,其余部分悬空。
③ Through the railing pipe fittings to the first column half ball position, the rest of the suspension.
④穿栏杆管件于第一、第二根立柱,并使其超出第一根立柱约75mm.
④ The pipe fittings through the railings shall be placed on the first and second columns and shall be about 75mm higher than the first column
⑤安装弯头并焊接固定。
⑤ Install the elbow and fix it by welding.
⑥安装余下的立柱并固定。
⑥ Install the remaining column and fix it.